User Tools

Site Tools


vaccum_chamber_sop

This is an old revision of the document!


Ozone Cleaner Training SOP

07/17/25 Goose

Location

The ozone cleaner is located inside the fume hood closest to the Objet printer in the Microfluidics Lab in Elings Hall 3430.

Operating Procedures

  1. Make sure pump is connected to correct vacuum chamber. One chamber is for PDMS only.
  2. Place sample in chamber
  3. Set valve to VACUUM
  4. Turn timer to desired time
  5. Wait
  6. After time has elapsed set valve to OPEN
  7. Wait for chamber pressure to equalize
  8. Remove sample
vaccum_chamber_sop.1752788594.txt.gz · Last modified: 2025/07/17 21:43 by gzhang