vaccum_chamber_sop
This is an old revision of the document!
Operating Procedures
- Make sure pump is connected to correct vacuum chamber. One chamber is for PDMS only.
- Place sample in chamber
- Set valve to VACUUM
- Turn timer to desired time
- Wait
- After time has elapsed set valve to OPEN
- Wait for chamber pressure to equalize
- Remove sample
vaccum_chamber_sop.1752788488.txt.gz · Last modified: 2025/07/17 21:41 by gzhang