User Tools

Site Tools


vaccum_chamber_sop

This is an old revision of the document!


Operating Procedures

  1. Make sure pump is connected to correct vacuum chamber. One chamber is for PDMS only.
  2. Place sample in chamber
  3. Set valve to VACUUM
  4. Turn timer to desired time
  5. Wait
  6. After time has elapsed set valve to OPEN
  7. Wait for chamber pressure to equalize
  8. Remove sample
vaccum_chamber_sop.1752788488.txt.gz · Last modified: 2025/07/17 21:41 by gzhang