3d_print_water_jet_cleaning_station
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
3d_print_water_jet_cleaning_station [2023/01/06 00:35] – [Operating Procedures] haley | 3d_print_water_jet_cleaning_station [2023/07/12 17:05] (current) – rylin | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== 3D print water jet cleaning station | + | ====== 3D Print Water Jet Cleaning Station |
Line 10: | Line 10: | ||
- | | **Description: | + | | **Description: |
| **Manufacturer: | | **Manufacturer: | ||
Line 33: | Line 33: | ||
- Place part within the pressure washer and open the DI valve on the sink. The power switch is located on the back of the washing enclosure. | - Place part within the pressure washer and open the DI valve on the sink. The power switch is located on the back of the washing enclosure. | ||
- Using the foot pedal, clean the part using the high pressure nozzles located within the enclosure | - Using the foot pedal, clean the part using the high pressure nozzles located within the enclosure | ||
- | - After part has been cleaned, **ensure the water is switched off** as leaks have occurred within Elings Hall before and will damage equipment | + | - After part has been cleaned, **ensure |
- To achieve optimal mechanical properties, or if part is to be used as a mold for casting, part should be baked at 60 degrees C for a minimum of 4 hours | - To achieve optimal mechanical properties, or if part is to be used as a mold for casting, part should be baked at 60 degrees C for a minimum of 4 hours | ||
3d_print_water_jet_cleaning_station.1672965302.txt.gz · Last modified: 2023/01/06 00:35 by haley