ultimaker_3_sop
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
ultimaker_3_sop [2022/08/27 00:13] – [Training Checklist:] haley | ultimaker_3_sop [2022/08/27 00:18] (current) – haley | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ======Ultimaker | + | ====== |
Last edited: Haley Holcomb (08/26/22) \\ | Last edited: Haley Holcomb (08/26/22) \\ | ||
Tool Lead: Jason Wei & Andrew Furst \\ | Tool Lead: Jason Wei & Andrew Furst \\ | ||
Line 137: | Line 137: | ||
====Overview: | ====Overview: | ||
- | * This training provides an introduction to using and operating the FDM 3D printers including: | + | * This training provides an introduction to using and operating the Stratasys F270: |
* File Types | * File Types | ||
* Software | * Software | ||
Line 143: | Line 143: | ||
* Printer Use | * Printer Use | ||
* Post processing | * Post processing | ||
- | | + | |
- | * Changing Print Heads | + | |
- | * Changing Fulfillment Type | + | |
- | * Cleaning | + | |
- | * Set up to print with with ABS by default, Other materials are available upon request. | + | |
* Work by extruding thermoplastic filament onto build platform-Build the part layer by layer. | * Work by extruding thermoplastic filament onto build platform-Build the part layer by layer. | ||
* Remember to enter job information into the 3D print job log! | * Remember to enter job information into the 3D print job log! | ||
====Safety==== | ====Safety==== | ||
- | * The print heads can be very hot - do not touch them with bare hands unless positive they are cool. | ||
* As with any automated machinery make sure that your body is clear of the moving parts to avoid injury. | * As with any automated machinery make sure that your body is clear of the moving parts to avoid injury. | ||
* The support removal tank is filled with heated caustic chemicals that dissolve the support material. An apron, Gloves, and a face shield must be worn when inserting and removing parts or basket from tank. | * The support removal tank is filled with heated caustic chemicals that dissolve the support material. An apron, Gloves, and a face shield must be worn when inserting and removing parts or basket from tank. | ||
Line 204: | Line 199: | ||
====Rates==== | ====Rates==== | ||
+ | F270: | ||
{| | {| | ||
Line 216: | Line 212: | ||
|} | |} | ||
- | Hourly | + | F270 hourly |
+ | |||
+ | Ultimaker: ABS: .12/gram | ||
----- | ----- |
ultimaker_3_sop.1661559193.txt.gz · Last modified: 2022/08/27 00:13 by haley