User Tools

Site Tools


process_info_pdms_devices

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
process_info_pdms_devices [2021/07/15 21:36] – [Solvent Cleaning] magnusonprocess_info_pdms_devices [2021/07/15 21:39] (current) – [Device Bonding] magnuson
Line 455: Line 455:
 ---- ----
 ==== Device Bonding ==== ==== Device Bonding ====
-Safety Considerations: +**Safety Considerations:** 
-The oven poses a burn hazard. Use protective gloves when handling. +  The oven poses a burn hazard. Use protective gloves when handling. 
-PPE Required: + 
-Insulated gloves. +**PPE Required:** 
-Gloves (Latex or Nitrile) +  Insulated gloves. 
-Eye Protection +  Gloves (Latex or Nitrile) 
-Lab Coat +  Eye Protection 
-Materials Needed: +  Lab Coat 
-Activated PDMS surface (for bonding) + 
-Activated glass surface (for bonding) +**Materials Needed:** 
-Aluminum foil +  Activated PDMS surface (for bonding) 
-Tools Needed: +  Activated glass surface (for bonding) 
-Oven  +  Aluminum foil 
-Tweezers + 
-Procedure: +**Tools Needed:** 
-The hydrophilicity of activated surfaces decreases rapidly with time. Perform this procedure immediately after surface activation. Use clean implements. Any dirt or contamination will negatively impact the device bonding. +  Oven  
-Using clean tweezers, carefully pick up the two pieces to be activated. Bring the activated surfaces in contact with each other. +  Tweezers 
-Work from one corner of the device to the other, gently pressing the surface to eliminate bubbles. + 
-Create a tray from aluminum foil, and place the device on it. This will facilitate baking the device. +**Procedure:** 
-Bake the joined device at 120 C for 20 minutes. This will create a permanent bond between the glass and the PDMS. (A drip tray is not necessary) +  The hydrophilicity of activated surfaces decreases rapidly with time. Perform this procedure immediately after surface activation. Use clean implements. Any dirt or contamination will negatively impact the device bonding. 
-Remove the device and let cool.+  Using clean tweezers, carefully pick up the two pieces to be activated. Bring the activated surfaces in contact with each other. 
 +  Work from one corner of the device to the other, gently pressing the surface to eliminate bubbles. 
 +  Create a tray from aluminum foil, and place the device on it. This will facilitate baking the device. 
 +  Bake the joined device at 120 C for 20 minutes. This will create a permanent bond between the glass and the PDMS. (A drip tray is not necessary) 
 +  Remove the device and let cool.
  
 ==== Port Alignment Fixture ==== ==== Port Alignment Fixture ====
  
process_info_pdms_devices.1626385008.txt.gz · Last modified: 2021/07/15 21:36 by magnuson