User Tools

Site Tools


3d_print_water_jet_cleaning_station

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Last revisionBoth sides next revision
3d_print_water_jet_cleaning_station [2023/01/06 00:35] – [Operating Procedures] haley3d_print_water_jet_cleaning_station [2023/01/06 01:20] – [Operating Procedures] haley
Line 33: Line 33:
   - Place part within the pressure washer and open the DI valve on the sink. The power switch is located on the back of the washing enclosure.   - Place part within the pressure washer and open the DI valve on the sink. The power switch is located on the back of the washing enclosure.
   - Using the foot pedal, clean the part using the high pressure nozzles located within the enclosure   - Using the foot pedal, clean the part using the high pressure nozzles located within the enclosure
-  - After part has been cleaned, **ensure the water is switched off** as leaks have occurred within Elings Hall before and will damage equipment+  - After part has been cleaned, **ensure that the water is switched off** as leaks have occurred within Elings Hall before and will damage equipment
   - To achieve optimal mechanical properties, or if part is to be used as a mold for casting, part should be baked at 60 degrees C for a minimum of 4 hours   - To achieve optimal mechanical properties, or if part is to be used as a mold for casting, part should be baked at 60 degrees C for a minimum of 4 hours
  
3d_print_water_jet_cleaning_station.txt · Last modified: 2023/07/12 17:05 by rylin