User Tools

Site Tools


3d_print_water_jet_cleaning_station

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Last revisionBoth sides next revision
3d_print_water_jet_cleaning_station [2023/01/06 00:34] – [Operating Procedures] haley3d_print_water_jet_cleaning_station [2023/01/06 01:20] – [Operating Procedures] haley
Line 33: Line 33:
   - Place part within the pressure washer and open the DI valve on the sink. The power switch is located on the back of the washing enclosure.   - Place part within the pressure washer and open the DI valve on the sink. The power switch is located on the back of the washing enclosure.
   - Using the foot pedal, clean the part using the high pressure nozzles located within the enclosure   - Using the foot pedal, clean the part using the high pressure nozzles located within the enclosure
-  - After part has been cleaned, **ensure the water is switched off** as leaks have occurred within Elings Hall before and will damage equipment+  - After part has been cleaned, **ensure that the water is switched off** as leaks have occurred within Elings Hall before and will damage equipment
   - To achieve optimal mechanical properties, or if part is to be used as a mold for casting, part should be baked at 60 degrees C for a minimum of 4 hours   - To achieve optimal mechanical properties, or if part is to be used as a mold for casting, part should be baked at 60 degrees C for a minimum of 4 hours
 +
 ---- ----
 ===== Detailed Specifications ===== ===== Detailed Specifications =====
3d_print_water_jet_cleaning_station.txt · Last modified: 2023/07/12 17:05 by rylin