User Tools

Site Tools


vapor_silanation_rig_sop_new

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
vapor_silanation_rig_sop_new [2023/10/20 21:38] – [Operating Guidelines] bdincauvapor_silanation_rig_sop_new [2023/10/20 21:41] (current) – [Safety] bdincau
Line 10: Line 10:
 sure the fume hood is closed when you are not working inside of it. Do not handle the silane without sure the fume hood is closed when you are not working inside of it. Do not handle the silane without
 consulting the MSDS. consulting the MSDS.
 +
 +The new glass reservoir has about 14x the free liquid surface area as the previous reservoir. This means that the **TMCS evaporates roughly 14x faster than before!** It will reach atmospheric pressure and leak within 2 hours if the silane valve is left open. Therefore, **we recommend that you only open the valve for the first 5 minutes of deposition.** Then fully close the valve and resume your deposition for as long as you need.
 ===== Trimethylchlorosilane ===== ===== Trimethylchlorosilane =====
 Synonyms: Synonyms:
vapor_silanation_rig_sop_new.1697837891.txt.gz · Last modified: 2023/10/20 21:38 by bdincau