vapor_silanation_rig_sop
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
vapor_silanation_rig_sop [2022/08/26 22:36] – [Operating Guidelines] haley | vapor_silanation_rig_sop [2023/04/04 21:28] (current) – [References] haley | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Vapor Silanation | + | ====== Vapor Silanization |
+ | 4/4/23 Haley Holcomb haleyholcomb@ucsb.edu | ||
===== Location ===== | ===== Location ===== | ||
- | The vapor silanation | + | The vapor silanization |
of the microfluidics lab, Elings 3430. | of the microfluidics lab, Elings 3430. | ||
===== Safety ===== | ===== Safety ===== | ||
Trimethylchlorosilane is flammable, toxic, and reacts with water vapor. It can make you sick if inhaled | Trimethylchlorosilane is flammable, toxic, and reacts with water vapor. It can make you sick if inhaled | ||
- | and ignite if it reacts with air or water vapor. It may only be used in the vapor silination | + | and ignite if it reacts with air or water vapor. It may only be used in the vapor silanization |
be opened in a nitrogen atmosphere. Protective eyewear, a lab coat, and gloves must be worn. Make | be opened in a nitrogen atmosphere. Protective eyewear, a lab coat, and gloves must be worn. Make | ||
sure the fume hood is closed when you are not working inside of it. Do not handle the silane without | sure the fume hood is closed when you are not working inside of it. Do not handle the silane without | ||
Line 31: | Line 32: | ||
- Close the fume hood and set a timer for 40 minutes. | - Close the fume hood and set a timer for 40 minutes. | ||
- Update the logbook with your end time. | - Update the logbook with your end time. | ||
- | - When your timer goes off, open the nitrogen valve until the pressure reads 5 in Hg. Open the vacuum valve until 15 in Hg. Repeat 5 times to purge the chamber again. | + | - When your timer goes off, close the silane valves (perpendicular). |
- | - Close the silane valves (perpendicular). | + | - Open the nitrogen valve until the pressure reads 5 in Hg. Open the vacuum valve until 15 in Hg. Repeat 5 times to purge the chamber again. |
- Remove your wafer. | - Remove your wafer. | ||
- Flip the sign back to “AVAILABLE” and close the hood. | - Flip the sign back to “AVAILABLE” and close the hood. | ||
===== References ===== | ===== References ===== | ||
- | {{ : | + | * {{ : |
- | {{ : | + | |
- | {{ :vapor_silanation_rig_sop_2_.pdf |}} | + | |
vapor_silanation_rig_sop.1661553410.txt.gz · Last modified: 2022/08/26 22:36 by haley