User Tools

Site Tools


start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
start [2025/05/08 18:36] – [Lab Announcements] bdincaustart [2025/06/11 17:17] (current) – [Lab Announcements] bdincau
Line 10: Line 10:
  
 ===== Lab Announcements ===== ===== Lab Announcements =====
-05/08/25 \\ +06/11/25 \\
-The lab manager has returned from vacation and is preparing next week's training schedule. There are currently ~25 outstanding requests and we will do our best to accommodate everyone asap. +
  
-04/07/25 \\ +**Summer Update:** There will be minimal Wizard support this summer at the Innovation WorkshopIf you submit jobsexpect them to be performed by the lab manager.
-There will be **no internet in Elings** this week **on Wednesday and Thursday.** Our local connection should still workso tools will function, but if you need to transfer data you must bring external (USB) storage.+
  
-Ensure that you log your reservation in FBSIf you typically make reservations from within the lab, please remember to do so beforehand or immediately afterThank you!+Additionally, we cannot offer CNC machining services at the moment due to staff shortageHowever, the lab manager may be able to take on CNC work starting in July.
  
  
-03/31/25 \\ +05/08/25 \\ 
-The **lab manager will be out of the country from 4/20 to 5/5.** During this time, there will be no new user orientations. Expect training, jobs, and tool maintenance to move a little slower than usual. +The lab manager has returned from vacation and is preparing next week'training schedule. There are currently about 30 outstanding requests and we will do our best to accommodate everyone asap
- +
-If you need an orientation (required for swipe access), I recommend requesting training ASAP using the form below the announcements. +
- +
-03/27/25 \\ +
-There will be an **all-campus power outage tonight** around 9pm. Power will remain off until tomorrow morning. We are powering off several tools in preparation for the outage+
  
-Since tomorrow is a holiday (Caesar Chavez), no one will be around to respond to any lingering tool issues until Monday 3/31. I recommend waiting until Monday to resume lab work in 3430.+If you posted limited availability (less than 2 timeslots per weekday), you may have to wait longer.
  
  
start.1746729387.txt.gz · Last modified: 2025/05/08 18:36 by bdincau