start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2025/03/27 21:32] – [Lab Announcements] bdincau | start [2025/06/11 17:17] (current) – [Lab Announcements] bdincau | ||
---|---|---|---|
Line 10: | Line 10: | ||
===== Lab Announcements ===== | ===== Lab Announcements ===== | ||
- | 03/27/25 \\ | + | 06/11/25 \\ |
- | There will be an **all-campus power outage tonight** around 9pm. Power will remain off until tomorrow morning. We are powering off several tools in preparation for the outage. | + | |
- | Since tomorrow is a holiday (Caesar Chavez), no one will be around to respond to any lingering tool issues until Monday 3/31. I recommend waiting until Monday | + | **Summer Update:** There will be minimal Wizard support this summer at the Innovation Workshop. If you submit jobs, expect them to be performed by the lab manager. |
- | 03/14/2025 \\ | + | Additionally, |
- | With finals | + | |
+ | 05/08/25 \\ | ||
+ | The lab manager has returned from vacation and is preparing next week's training schedule. There are currently about 30 outstanding requests | ||
+ | |||
+ | If you posted limited availability (less than 2 timeslots per weekday), you may have to wait longer. | ||
Line 29: | Line 32: | ||
- | 01/13/2025 \\ | ||
- | |||
- | **The CrystalMark is currently down.** We are waiting for some replacement parts before we continue troubleshooting. The tool has also been moved to the back of the room, to make space for a new laser cutter. | ||
- | |||
- | Update from 2/11/25 - still no luck. We've troubleshot the tool quite a bit and are taking a break for now to focus on other lab tasks. If you are deeply concerned with the status of the CrystalMark, | ||
- | |||
- | |||
- | 12/05/2024 __**\\ Winter Mega Announcement**__ \\ \\ | ||
- | There will be **no training offered from 12/20/24 through 01/06/25.** Additionally, | ||
- | |||
- | Elings Hall will be closed to those without swipe access from 12/20 through 01/06. During this time, there will be **intermittent DI Water and Exhaust work, preventing safe use of the fume hoods.** Please take this time for vacation, data analysis, or other activities that do not require lab use. | ||
- | **We are currently experiencing some waterjet issues.** The pinch valve that controls abrasive flow is cracked. We are working on a fix, but it may require some replacement parts. **ETA for new parts is Tuesday 12/17** | ||
- | Happy holidays and see you next year!! ⭐🌲⛄ | ||
start.1743111158.txt.gz · Last modified: 2025/03/27 21:32 by bdincau