start [2025/03/27 21:32] – [Lab Announcements] bdincaustart [2025/06/11 17:17] (current) – [Lab Announcements] bdincau
Line 10: Line 10:
  
 ===== Lab Announcements ===== ===== Lab Announcements =====
-03/27/25 \\ +06/11/25 \\
-There will be an all-campus power outage tonight around 9pm. Power will remain off until tomorrow morning. We are powering off several tools in preparation for the outage. +
  
-Since tomorrow is a holiday (Caesar Chavez), no one will be around to respond to any lingering tool issues until Monday 3/31I recommend waiting until Monday to resume lab work in 3430.+**Summer Update:** There will be minimal Wizard support this summer at the Innovation WorkshopIf you submit jobs, expect them to be performed by the lab manager.
  
-03/14/2025 \\+Additionally, we cannot offer CNC machining services at the moment due to staff shortage. However, the lab manager may be able to take on CNC work starting in July.
  
-With finals week + Spring Break coming up, the Workshop Wizards will have little availabilityTherefore, **our training and job capacity will be diminished until Spring quarter** starts upSorry for any inconvenience and please reach out to the lab manager if you have any urgent concerns.+ 
 +05/08/25 \\ 
 +The lab manager has returned from vacation and is preparing next week's training scheduleThere are currently about 30 outstanding requests and we will do our best to accommodate everyone asap 
 + 
 +If you posted limited availability (less than 2 timeslots per weekday), you may have to wait longer.
  
  
Line 29: Line 32:
  
  
-01/13/2025 \\ 
- 
-**The CrystalMark is currently down.** We are waiting for some replacement parts before we continue troubleshooting. The tool has also been moved to the back of the room, to make space for a new laser cutter. 
- 
-Update from 2/11/25 - still no luck. We've troubleshot the tool quite a bit and are taking a break for now to focus on other lab tasks. If you are deeply concerned with the status of the CrystalMark, please contact the lab manager. 
- 
- 
-12/05/2024 __**\\ Winter Mega Announcement**__ \\ \\ 
-There will be **no training offered from 12/20/24 through 01/06/25.** Additionally, training will be extremely limited from 12/9/24 through 12/20/24 due to limited Workshop Wizard availability.  
- 
-Elings Hall will be closed to those without swipe access from 12/20 through 01/06. During this time, there will be **intermittent DI Water and Exhaust work, preventing safe use of the fume hoods.** Please take this time for vacation, data analysis, or other activities that do not require lab use. 
  
-**We are currently experiencing some waterjet issues.** The pinch valve that controls abrasive flow is cracked. We are working on a fix, but it may require some replacement parts. **ETA for new parts is Tuesday 12/17** 
  
-Happy holidays and see you next year!! ⭐🌲⛄ 
  
  