start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2025/02/11 20:28] – [Lab Announcements] bdincau | start [2025/05/08 18:48] (current) – [Lab Announcements] bdincau | ||
---|---|---|---|
Line 10: | Line 10: | ||
===== Lab Announcements ===== | ===== Lab Announcements ===== | ||
- | 02/11/2025 \\ | + | 05/08/25 \\ |
+ | The lab manager has returned from vacation and is preparing next week's training schedule. There are currently about 30 outstanding requests and we will do our best to accommodate everyone asap. | ||
- | As some of you may know, we recently installed a **new laser cutter.** It's much more powerful | + | If you posted limited availability (less than 2 timeslots per weekday), you may have to wait longer. |
- | This means it can cut a much wider range of materials. You can learn more about the new laser cutter [[thunderlaser_nova35 | here]] | + | |
+ | 04/07/25 \\ | ||
+ | There will be **no internet in Elings** this week **on Wednesday and Thursday.** Our local connection should still work, so tools will function, but if you need to transfer data you must bring external (USB) storage. | ||
- | We are currently phasing out the old Trotec. If you need to laser cut, please | + | Ensure that you log your reservation in FBS. If you typically make reservations from within the lab, please |
- | 01/13/2025 \\ | + | 03/31/25 \\ |
+ | The **lab manager will be out of the country from 4/20 to 5/5.** During this time, there will be no new user orientations. Expect training, jobs, and tool maintenance to move a little slower than usual. | ||
- | **The CrystalMark is currently down.** We are waiting | + | If you need an orientation (required |
- | Update from 2/11/25 - still no luck. We've troubleshot the tool quite a bit and are taking a break for now to focus on other lab tasks. If you are deeply concerned with the status of the CrystalMark, | + | 03/27/25 \\ |
+ | There will be an **all-campus power outage tonight** around 9pm. Power will remain off until tomorrow morning. We are powering off several tools in preparation | ||
+ | Since tomorrow is a holiday (Caesar Chavez), no one will be around to respond to any lingering tool issues until Monday 3/31. I recommend waiting until Monday to resume lab work in 3430. | ||
+ | |||
+ | |||
+ | 02/11/2025 \\ | ||
+ | |||
+ | As some of you may know, we recently installed a **new laser cutter.** It's much more powerful than the Trotec, with a larger bed and a more effective air assist. | ||
+ | This means it can cut a much wider range of materials. You can learn more about the new laser cutter [[thunderlaser_nova35 | here]] | ||
+ | |||
+ | |||
+ | We are currently phasing out the old Trotec. If you need to laser cut, please request training on the new laser cutter asap. **The Trotec will no longer be available for regular use.** You can find the training request form below the announcements. | ||
- | 12/05/2024 __**\\ Winter Mega Announcement**__ \\ \\ | ||
- | There will be **no training offered from 12/20/24 through 01/06/25.** Additionally, | ||
- | Elings Hall will be closed to those without swipe access from 12/20 through 01/06. During this time, there will be **intermittent DI Water and Exhaust work, preventing safe use of the fume hoods.** Please take this time for vacation, data analysis, or other activities that do not require lab use. | ||
- | **We are currently experiencing some waterjet issues.** The pinch valve that controls abrasive flow is cracked. We are working on a fix, but it may require some replacement parts. **ETA for new parts is Tuesday 12/17** | ||
- | Happy holidays and see you next year!! ⭐🌲⛄ | ||
start.1739305696.txt.gz · Last modified: 2025/02/11 20:28 by bdincau