start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2025/01/13 21:57] – [Lab Announcements] bdincau | start [2025/06/11 17:17] (current) – [Lab Announcements] bdincau | ||
---|---|---|---|
Line 10: | Line 10: | ||
===== Lab Announcements ===== | ===== Lab Announcements ===== | ||
- | 01/13/2025 \\ | + | 06/11/25 \\ |
- | **The CrystalMark is currently down.** We are waiting for some replacement parts before we continue troubleshooting. The tool has also been moved to the back of the room, to make space for a new laser cutter. | + | **Summer Update:** There will be minimal Wizard support this summer at the Innovation Workshop. If you submit jobs, expect them to be performed by the lab manager. |
+ | Additionally, | ||
- | 01/08/2025 \\ | ||
- | **The waterjet | + | 05/08/25 \\ |
+ | The lab manager has returned from vacation and is preparing | ||
+ | If you posted limited availability (less than 2 timeslots per weekday), you may have to wait longer. | ||
- | 12/05/2024 __**\\ Winter Mega Announcement**__ \\ \\ | + | 02/11/2025 \\ |
- | There will be **no training | + | |
+ | As some of you may know, we recently installed a **new laser cutter.** It's much more powerful than the Trotec, with a larger bed and a more effective air assist. | ||
+ | This means it can cut a much wider range of materials. You can learn more about the new laser cutter [[thunderlaser_nova35 | here]] | ||
+ | |||
+ | |||
+ | We are currently phasing out the old Trotec. If you need to laser cut, please request | ||
- | Elings Hall will be closed to those without swipe access from 12/20 through 01/06. During this time, there will be **intermittent DI Water and Exhaust work, preventing safe use of the fume hoods.** Please take this time for vacation, data analysis, or other activities that do not require lab use. | ||
- | **We are currently experiencing some waterjet issues.** The pinch valve that controls abrasive flow is cracked. We are working on a fix, but it may require some replacement parts. **ETA for new parts is Tuesday 12/17** | ||
- | Happy holidays and see you next year!! ⭐🌲⛄ | ||
- | 10/31/24 \\ | ||
- | Happy Halloween! 🎃🎃 As of this morning, we have finished setting up an **additional Bambu X1 Carbon**! This has displaced the Ultimaker S5, which we are retiring immediately. | ||
- | 9/18/24 \\ | ||
- | All issues with the laser cutter have now been resolved. If you change any of the default settings in Corel Draw or Job Control, please make sure to change them back after use. | ||
- | 06/06/24 \\ | ||
- | This summer, **the Innovation Workshop is moving to Elings 3430.** For more information, | ||
start.1736805447.txt.gz · Last modified: 2025/01/13 21:57 by bdincau