User Tools

Site Tools


sae_battery_segment_manufacture_assembly

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
sae_battery_segment_manufacture_assembly [2023/06/06 18:55] – Battery segments weisae_battery_segment_manufacture_assembly [2023/06/06 18:58] (current) wei
Line 60: Line 60:
  
 ====Machining of insulation panels==== ====Machining of insulation panels====
-  - Fixture panels, program cam, and set up tools on ShopBot Router referencing [[http://microfluidics.cnsi.ucsb.edu/wiki/doku.php?id=shopbotdesktoptrainingsop|ShopBot SOP]] {{:wiki:fsae:insulationcnc.jpg}}+  - Fixture panels, program cam, and set up tools on ShopBot Router referencing [[http://microfluidics.cnsi.ucsb.edu/wiki/doku.php?id=shopbotdesktoptrainingsop|ShopBot SOP]]  
 +{{:wiki:fsae:insulationcnc.jpg?400}}
     *Set up vacuum attachment and wear masks to minimize inhalation of fine fiberglass particles     *Set up vacuum attachment and wear masks to minimize inhalation of fine fiberglass particles
   - File edges of panels to remove sharp glass fibers   - File edges of panels to remove sharp glass fibers
  
 ====Assembly of Enepaq modules within insulation==== ====Assembly of Enepaq modules within insulation====
-  - Insert modules with correct polarities and use epoxy to bond base and side panels of segment {{:wiki:fsae:batterysegmentclamp.png}}+  - Insert modules with correct polarities and use epoxy to bond base and side panels of segment  
 +{{:wiki:fsae:batterysegmentclamp.png}}
   - **Wear proper PPE (listed in safety considerations section); those without PPE should remain five feet away** and connect modules together using bolts and busbars   - **Wear proper PPE (listed in safety considerations section); those without PPE should remain five feet away** and connect modules together using bolts and busbars
     * **Cover work surface and ground with electrically insulating mat and use insulated tools**     * **Cover work surface and ground with electrically insulating mat and use insulated tools**
Line 71: Line 73:
     * Attach temperature sensing wires to module xr connector     * Attach temperature sensing wires to module xr connector
   - Route wires through holes in top panel   - Route wires through holes in top panel
-  - Connect voltage taps carefully and avoid short circuiting any modules {{:wiki:fsae:batterybusbarconnection.png}} +  - Connect voltage taps carefully and avoid short circuiting any modules  
-  - Bond top panels to enclose segment  {{:wiki:fsae:batterysegmentclamp2.png}}+{{:wiki:fsae:batterybusbarconnection.png}} 
 +  - Bond top panels to enclose segment   
 +{{:wiki:fsae:batterysegmentclamp2.png}}
  
sae_battery_segment_manufacture_assembly.1686077753.txt.gz · Last modified: 2023/06/06 18:55 by wei